Agriculture Local News News BLPC to carry out work at the Belle Pumping Station Barbados Today29/02/20200298 views The Barbados Water Authority (BWA) wishes to inform the public that the Barbados Light & Power Company Ltd. (BLPC) is scheduled to carry out work at the Belle Pumping Station on Sunday, March 1 between 9 and 10 am. Pumping from the Station will cease temporarily for the work to be carried out. Customers in some St Michael and Christ Church districts may be affected by low pressure or water outages as a result of the stoppage. Once pumping resumes, customers can expect their water supply to gradually return to normal. Water tankers will assist residents as needed. The Barbados Water Authority apologizes for the inconvenience this stoppage may cause.