Local NewsNews Constitution River project phase III to conclude in six weeks by Barbados Today 19/04/2022 written by Barbados Today Updated by Sandy Deane 19/04/2022 1 min read A+A- Reset FacebookTwitterLinkedinWhatsappEmail 426 The Barbados Tourism Investment Inc. (BTI) wishes to inform the public that the Constitution River Project – Phase III will conclude in six weeks weather permitting, with remedial works and site preparation. The project, which has been ongoing for 18 months, includes reconstructive work to the river channel and its environs. Last Thursday, the C.O. Williams Construction team began removing the dam that was constructed in the early stages of the project, which prevented water from flowing along the Constitution Bridge to the James A. Tudor Roundabout in The City. As a result of the partial removal of the dam, the area of the river channel to the roundabout has been refilled with water. The BTI thanks the public for their patience and cooperation during the project. (PR) Barbados Today Stay informed and engaged with our digital news platform. The leading online multimedia news resource in Barbados for news you can trust. You may also like St Kitts PM sent overseas for medical observation 01/09/2026 โProject CAREโ relaunches as long-term food security drive 01/09/2026 โ Project to bring farming to Deacons Farm, support 600 families 01/09/2026